EAC Certification for Amur Gas Processing Plant (GPP) | 2022
The Amur Gas Processing Plant is located near the town of Svobodniy, in the Amur region. Designed to process 42 billion cubic meters of gas per year and occupying 800 hectares, this is one of the largest gas processing facilities in the world.
GPP Profile
The Amur GPP is constructed to produce such substances as helium, ethane, propane, butane and other gases valued in the gas chemical and other industries. The natural gas is delivered to the plant through mainly the Power of Siberia pipeline from the Chayandinskoye field in Yakutia). It is also planned to deliver gas through the Kovyktinskoye field in Irkutsk Region.
The construction of the plant started in October 2015, and in September 2021 two production trains were in operation. According to the construction schedule, the GPP will be fully operating with 6 production trains in 2025.
On-Site Certification
One of the most prominent features of Amur GPP is its on-site customs station. In June 2021, a separate subdivision of the Blagoveshchensk customs post started to receive and formalize the technological equipment for the first complex of the plant.
As a large number of equipment used for construction and further operation of the plant is imported from such countries as South Korea, Italy, Germany, China and many other. To facilitate the import procedure and logistics, the customs are operating on the territory of the plant.
To import the equipment to be used on the territory of Amur GPP, it is required to obtain approval documents.
WWG partners with reliable suppliers of EAC certification that are specialized in multiple technical regulations and other approvals. Our partners have experts residing on the territory of Amur GPP who are ready to carry out required testing on-site as soon as the equipment arrives to the Blagoveshchensk customs post.
WWG helps to obtain approvals to import your equipment to Amur GPP:
- EAC Certificates and Declarations TR CU 004/2011 LVD
- EAC Certificates and Declarations TR CU 020/2011 EMC
- EAC Certificates and Declarations TR CU 012/2011 Ex-proof
- EAC Certificates and Declarations 032/2013 Pressure Operating Equipment
- PAC (MPA) Approvals and Primary Verification
- FSS Notifications and FAC Declarations
- Technical documents (technical passport, operating manual, safety justification, ignition risk assessment)
and many other types of approvals and Technical Regulations of the Customs Union (TR CU).
Please send your requests to inquiry@wwg.eu.com